India’s Small Hydro Power
Source: PIB
GS II: Environment
Overview
- The Northern region has the greatest potential (8,030 MW), followed by the Southern (5,490 MW), North-Eastern (2,995 MW), Western (2,912 MW), and Eastern (1,707 MW).
- SHP Development Scheme aims to install about 1,500 MW through 1-25 MW projects, with special emphasis on hilly and North-Eastern States. It restores Central Financial Assistance (CFA) for small hydro, discontinued in 2017.
Nodal Agencies: MNRE sanctions projects; Solar
Why in the News?
Union Cabinet approved the Small Hydro Power (SHP) Development Scheme for FY 2026-27 to FY 2030-31 to harness India’s untapped small hydro potential faster.
News in Brief
- In India, hydropower projects up to 25 MW are classified as small hydro (SHP) and administered by the Ministry of New and Renewable Energy (MNRE); larger projects fall under the Ministry of Power.
- SHP Classification: Micro (up to 100 kW), mini (101 kW to 2 MW), and small (2 MW to 25 MW).
Key Takeaways
- Assessed Potential: India has an estimated SHP potential of 21,134 MW across 7,133 identified sites.
- Utilisation Gap: By September 2026, only around 25% of this potential had been harnessed.
- Regional Spread: The Northern region has the greatest potential (8,030 MW), followed by the Southern (5,490 MW), North-Eastern (2,995 MW), Western (2,912 MW), and Eastern (1,707 MW).
- State Leaders: Karnataka leads in both potential (3,726 MW) and installed capacity (about 1,285 MW), ahead of Himachal Pradesh (3,460 MW and about 1,013 MW).
- North-Eastern Gap: Only about 141 MW of the 2,065 MW of potential in Arunachal Pradesh (the North-East’s largest) has been utilised.
About SHP Development Scheme
- SHP Development Scheme aims to install about 1,500 MW through 1-25 MW projects, with special emphasis on hilly and North-Eastern States. It restores Central Financial Assistance (CFA) for small hydro, discontinued in 2017.
- Nodal Agencies: MNRE sanctions projects; Solar Energy Corporation of India (SECI), the National Programme Implementing Agency (NPIA), appraises applications and processes CFA releases.
- Eligibility: Only projects allotted through transparent competitive bidding qualify for CFA, provided construction begins after the scheme’s approval.
- North-Eastern States and international border districts qualify for CFA of ₹3.6 crore per MW or 30% of the project cost (whichever is lower), up to ₹30 crore per project.
- Other States receive ₹1.78-2.40 crore per MW (based on project size and location) or 20% of the project cost, whichever is lower, capped at ₹20 crore per project.
- Generation-Linked Release: To receive the final CFA instalment, a commissioned project must achieve at least 80% of the monthly output projected in its Detailed Project Report (DPR).
- Project Pipeline & DPR Support: A separate ₹30 crore allocation funds DPR preparation by Central and State agencies for at least 200 projects.
- Economic Spillovers: Expected to attract ₹15,000 crore in investment, create 51 lakh construction workdays, and boost indigenous plant and machinery under Atmanirbhar Bharat.
Daily Current Affairs: Click Here